Live opening · Posted 9 days ago

QA/QC Manager / Engineer – Data Center Construction | Noida

Job24by7 · Tamil Nadu, India (On-site)
Linkedin No
You are 9 days behind. JobBeeper subscribers saw this role while it was still new.

At a glance

The key details from the original listing.

Posted 9 days ago
CompanyJob24by7
LocationTamil Nadu, India (On-site)
Work modeNo
SourceLinkedin
Listed9 days ago

Your early-applicant advantage

Live timing from JobBeeper.

Live data
8 min from Linkedin publishing this role to us finding it
2 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
72,057 roles found in the last 24 hours — the newest are not on this site yet
Start your free trial →

About the role

Description supplied by the original job listing.

Title: QA/QC Engineer / QA/QC Manager
Project: Data Center Project
Location: Noida, Uttar Pradesh
Qualification: B.E./B.Tech in Civil Engineering
Experience:
8-12 years of QA/QC experience in data center project and construction projects.
Proven experience in Data Center, Industrial, Warehouse, Commercial Building, or Large Infrastructure Projects.
Preferred Candidate Profile:
Candidates from Tamil Nadu will be preferred.
Must have relevant Data Center project experience.
Should be currently working in or around Noida/NCR and available for site-based project execution.
Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.
Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.
Role Overview:
We are seeking an experienced QA/QC Engineer / QA/QC Manager to lead and manage all quality assurance and quality control activities for a large-scale Data Center Project in Noida involving PEB structures, structural steel works, composite steel-concrete structures, RCC/concrete works, foundations, and associated civil works.
The candidate will be responsible for establishing, implementing, and maintaining the project QA/QC system to ensure compliance with approved drawings, specifications, method statements, Inspection & Test Plans (ITPs), applicable standards, and client/consultant requirements.
Key Responsibilities:
1. Quality Assurance:
Prepare and implement Project Quality Plans (PQP), Inspection & Test Plans (ITPs), quality procedures, checklists, and method statements.
Review AFC drawings, specifications, BOQ, material specifications, and project quality requirements.
Establish inspection procedures for PEB, structural steel, composite structures, RCC, and civil works.
Coordinate with client, consultant, contractors, subcontractors, design teams, and third-party inspection agencies.
Ensure all materials and construction activities comply with approved specifications and applicable standards.
Maintain complete QA/QC documentation, inspection records, test reports, MIRs, WIRs, NCRs, and quality dossiers.
2. PEB & Structural Steel Quality Control:
Inspect incoming PEB and structural steel materials including plates, sections, bolts, welding consumables, and accessories.
Verify Mill Test Certificates (MTCs), material grades, heat numbers, and traceability records.
Monitor fabrication quality including:
Cutting and profiling
Plate preparation
Welding
Dimensional control
Camber and alignment
Surface preparation
Painting and coating
Review and monitor WPS, PQR, and welder qualification records.
Coordinate and review NDT activities such as UT, MPI, and DPT.
Inspect high-strength bolted connections, torqueing, and installation records.
Monitor erection activities including alignment, plumbness, levels, bracing, stability, and connection details.
Verify member identification and traceability from fabrication through erection.
Inspect roofing, cladding, flashings, gutters, and associated PEB accessories.
3. Composite Structure Quality Control:
Inspect composite beams, deck sheets, shear connectors/studs, and associated structural steel components.
Verify deck profile, thickness, fixing arrangements, and end laps.
Inspect shear stud welding quality, spacing, positioning, and testing.
Verify reinforcement placement over metal decking.
Check temporary supports and shoring before concrete placement.
Monitor concrete pouring, slab thickness, levels, curing, and finishing.
Verify openings, embedded items, sleeves, and MEP coordination prior to concrete placement.
4. RCC / Concrete Quality Control:
Inspect reinforcement for:
Grade and diameter
Bar bending schedules
Spacing and positioning
Lap lengths
Development lengths
Anchorage
Concrete cover
Chairs and spacers
Inspect formwork for dimensions, stability, line, level, plumbness, and cleanliness.
Conduct pre-pour inspections and obtain necessary approvals.
Monitor concrete batching, transportation, placing, vibration, finishing, and curing.
Verify concrete grade, slump, temperature, and cube sampling requirements.
Coordinate laboratory testing and compressive strength evaluations.
Inspect foundations, pedestals, columns, beams, slabs, and other RCC elements.
Verify construction joints, expansion joints, water stops, and embedded items.
Monitor repairs of honeycombing, cracks, and other defects as per approved procedures.
5. Material Inspection & Testing:
Prepare and submit Material Inspection Requests (MIRs).
Verify all materials against approved material submittals.
Maintain material traceability from receipt through installation.
Control and segregate non-conforming materials.
Coordinate third-party laboratory testing and inspections.
6. Inspection & Documentation Control:
Maintain and control records for:
MIR – Material Inspection Requests
WIR – Work Inspection Requests
RFI – Requests for Inspection / Information
Inspection & Test Plans (ITPs)
Method Statements
Concrete Pour Cards
Slump Test Reports
Cube Test Reports
Rebar Inspection Reports
Welding Inspection Reports
NDT Reports
Bolt Torque Reports
Coating / DFT Reports
Survey & Alignment Reports
PEB Erection Inspection Records
NCR/CAR Records
Final Quality Dossiers
7. NCR Management & Corrective Actions:
Identify quality deviations and issue NCRs.
Conduct root-cause analysis for recurring issues.
Develop and monitor Corrective and Preventive Action (CAPA) plans.
Ensure timely NCR closure with supporting documentation.
Maintain quality observation registers and punch-point records.
Conduct periodic audits of subcontractors and vendors.
8. Site Coordination & Reporting:
Attend daily and weekly quality meetings with client, consultants, and stakeholders.
Coordinate with construction, engineering, planning, procurement, and subcontractor teams.
Ensure inspections are completed prior to commencement of subsequent activities.
Monitor subcontractor QA/QC performance.
Conduct quality awareness programs and toolbox talks.
Ensure latest approved drawings and revisions are available at site.
Support preparation of as-built drawings and final handover documentation.
Prepare weekly and monthly QA/QC reports.
Required Qualifications & Experience:
B.E./B.Tech in Civil Engineering.
8-12 years of QA/QC experience in construction projects.
Mandatory experience in Data Center Projects.
Strong expertise in PEB/Structural Steel and RCC/Concrete Works.
Experience in welding inspection, NDT coordination, material traceability, and quality documentation.
Exposure to industrial, warehouse, commercial, or large infrastructure projects is preferred.
Experience handling client and consultant inspections.
Exposure to third-party inspections and testing agencies.
Candidates currently working in Noida/NCR will be preferred.
Candidates from Tamil Nadu are encouraged to apply.
Preferred Certifications:
ISO 9001
CSWIP / AWS
Welding Inspector Certification
NDT Level II

Work arrangement
No

Get JobBeeper Mobile App

Never miss a job opening! Get instant job alerts on your phone.

Subscribers see fresh openings within minutes. Download the JobBeeper App on Google Play to get real-time push notifications and apply before anyone else.

⚡ Instant Push Alerts 🎯 Tailored Filters 🚀 Direct Employer Links
GET IT ON Google Play

More openings worth a look

Recently tracked roles with full details and direct application links.

6 roles
Good roles move before most people even see them. Tell JobBeeper what you want and get fresh matches delivered in minutes.
Start your free trial →
⚡ Get fresh job alerts 📱 Get App