Live opening · Posted 7 days ago

Technical Program Manager, AI Factory Infrastructure

NVIDIA · Oregon, United States (Remote)
Linkedin No
You are 7 days behind. JobBeeper subscribers saw this role while it was still new.

At a glance

The key details from the original listing.

Posted 7 days ago
CompanyNVIDIA
LocationOregon, United States (Remote)
Work modeNo
SourceLinkedin
Listed7 days ago

Your early-applicant advantage

Live timing from JobBeeper.

Live data
45 min from Linkedin publishing this role to us finding it
11 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
61,009 roles found in the last 24 hours — the newest are not on this site yet
Start your free trial →

About the role

Description supplied by the original job listing.

NVIDIA's AI Factory Infrastructure team develops global reference designs, de-risks technologies needed for the next generation of compute and network products and builds AI infrastructure at scale to validate solutions at scale. As a TPM on the team, you’ll be responsible for leading teams that are highly multi-functional, including hardware, software and facility infrastructure teams, to deliver solutions and infrastructure. This role offers a truly unique blend of developing future solutions and products with building infrastructure at scale.
What You Will Be Doing
Collaborate with product owners and technical leads to identify and collect requirements for next-generation AI Factories.
Build, supervise, and complete long-term programs including schedules, resourcing, and checkpoints.
Work with data center and hardware teams to find creative solutions to hard problems, and co-develop solutions and mitigation strategies.
Lead planning with key internal partners on capacity demands with engineering roadmaps and data center expansions.
Own end-to-end delivery of 100MW+ AI factory data center deployments, from construction readiness through commissioning, turn-up, and handoff to operations.
Coordinate general contractors, colocation providers, utilities, and OEMs to align electrical/mechanical scope, long-lead equipment, and site logistics for large-scale AI cluster deployments.
Drive integrated readiness reviews and acceptance criteria across power, liquid cooling, networking, and platform/hardware teams to ensure performance and reliability targets are met for AI factory applications.
Develop program plans for government grants and initiatives.
Translate program requirements into Basis Of Design documents
Bring together team members and foster a collaborative approach to delivery while holding team members accountable to action items and timelines.
What We Need To See
Outstanding long-term planning and execution skills to carry our data center lifecycle planning, including large-scale AI factory buildouts and expansions.
Experience managing end-to-end data center deployments for high-density AI infrastructure, including commissioning, readiness reviews, turn-up, and operational handoff.
Demonstrated ability to coordinate across colocation providers, general contractors, utilities, and OEMs to deliver complex electrical and mechanical scope (e.g., at 100MW+ campus scale).
Strong technical and program leadership across power delivery, liquid cooling, networking, and compute/platform teams to define acceptance criteria and ensure performance and reliability targets are met.
12+ years of experience providing program and project management leadership for data center projects covering construction of mechanical, electrical, and plumbing with large-scale server, storage, and network deployments.
BS or MS degree in Engineering (or equivalent experience).
Ways To Stand Out From The Crowd
In-depth knowledge of infrastructure (hardware and software) data center facilities infrastructure (electrical and mechanical) technologies.
Familiarity with NVIDIA’s AI compute technology stack and ability to translate platform requirements into data center infrastructure designs (power delivery, liquid cooling, space, and network topology) at scale.
Experience with colocation data center environments
Your base salary will be determined based on your location, experience, and the pay of employees in similar positions. The base salary range is 200,000 USD - 322,000 USD for Level 5, and 240,000 USD - 379,500 USD for Level 6.
You will also be eligible for equity and benefits.
Applications for this job will be accepted at least until September 24, 2026.
This posting is for an existing vacancy.
NVIDIA uses AI tools in its recruiting processes.
NVIDIA is committed to fostering an inclusive work environment and proud to be an equal opportunity employer. As we highly value diversity in our current and future employees, we do not discriminate (including in our hiring and promotion practices) on the basis of race, religion, color, national origin, gender, gender expression, sexual orientation, age, marital status, veteran status, disability status or any other characteristic protected by law.
, , JR2024574

Work arrangement
No

Get JobBeeper Mobile App

Never miss a job opening! Get instant job alerts on your phone.

Subscribers see fresh openings within minutes. Download the JobBeeper App on Google Play to get real-time push notifications and apply before anyone else.

⚡ Instant Push Alerts 🎯 Tailored Filters 🚀 Direct Employer Links
GET IT ON Google Play

More openings worth a look

Recently tracked roles with full details and direct application links.

6 roles
Good roles move before most people even see them. Tell JobBeeper what you want and get fresh matches delivered in minutes.
Start your free trial →
⚡ Get fresh job alerts 📱 Get App