Live opening · Posted 7 days ago

PF TPP WHRS (BOP Erection)

UltraTech Cement · Gujarat, India (On-site)
Linkedin No
You are 7 days behind. JobBeeper subscribers saw this role while it was still new.

At a glance

The key details from the original listing.

Posted 7 days ago
CompanyUltraTech Cement
LocationGujarat, India (On-site)
Work modeNo
SourceLinkedin
Listed7 days ago

Your early-applicant advantage

Live timing from JobBeeper.

Live data
507 min from Linkedin publishing this role to us finding it
6 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
73,899 roles found in the last 24 hours — the newest are not on this site yet
Start your free trial →

About the role

Description supplied by the original job listing.

Job Purpose
Preparation of Technical Tender documents and Floating enquiry for Balance of plant mechanical erection package for TPP and WHRS project.
Discussion with vendor on offer and Preparation of Technical evaluation report
Checking of engineering document for the BOP, providing input to other stake holder i.e. Mechanical, E&I and Civil for engineering.
Monitoring day to day activity at project site and preparation of MIS for the same.
Highlighting important points to management.
Collection of data of Operating Plants i.e. KPI data, CAPEX status and performances
Job Context & Major Challenges
With a vision of increasing the cement capacity from 115 MTPA to 140 MTPA by 2024, Central Project Cell needs to be strengthened with a clear focus on optimizing project cost & time with emphasis on Safety.
Project Cell is having in House capabilities to build a cement plant & Captive Power Plant/ Modernization of plants / Efficiency improvements through innovative projects.
The Team in project cell is consisting of Intellectuals, Subject Matter Experts and designers. More than 20 MTPA of cement capacity is added since formation of project cell through execution of 04 IUs, 07 GUs, 02 BTs along with 132 MW of Waste Heat Recovery system and 155 MW Captive Power Plants.
Apart from this Project cell is also associated with inorganic growth of 41MTPA.
Currently projects under execution at 12 locations and proposal under approval for 11 locations with a capex outflow of more than 9000 Crs.
Presently, Cement business has 23 integrated units, 24 grinding units, 07 bulk terminals and further spreading its footprint steadily with new brown field/ Green Field projects and acquisitions.
To maintain our market leadership & cost competitiveness it is important to continuously modernize by implementing innovative ideas in existing units, execution of new projects and acquisition. Project Cell is playing a vital role for achieving this objective.
This position is a part of the Project Cell.
Key Result Areas
KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)
KRA1 KRA1
Package ordering BOP Mechanical erection package
Preparation of tender for package and floating enquiry for the same.
Review of offer received and analysis of impact for deviation requested.
Preparation for Technical evaluation report
KRA2 KRA2
Review engineering for BOP Mechanical erection package
Review of engineering document received from vendor and approval.
Sharing input with other stake holder
Follow-up with vendor for completion of engineering activity as per schedule.
KRA3 KRA3
Detailed engineering for BOP
Generating drawing required for inter face engineering.
Updating as per inputs received from other stake holders.
Adhering to time lines, ensuring ease of execution & correctness in all respect.
KRA4 KRA4
To monitor the project schedule and ensure execution as per schedule
Follow-up with vendor for equipment deliveries at project sites
Monitor Schedules of complete project activities and discuss mitigation plan for the critical activities with stakeholder
Arranging timely submission, approval and release of drawings for execution at site
To monitor contractors’ performance during execution and discuss interventions and support with additional plant and machinery resources to expedite the execution.
To identity support required to site execution team for installation and commissioning
Monitoring dispatch of equipment’s for vendor for timely execution of project
KRA5 KRA5
To monitor CAPEX of Operating Plants, Collect data for the operating plant and identify improvement opportunity in TPP & WHRS
Collection of data for WHRS and TPP KPI and identify the gap in performance. Updating report to management for preparation of WHRS and TPP Road Map.
To prepare note on Proposed technical schemes of Existing Plants and Facilitate Approval.
Checking of Technical Offers for the Approved Schemes.

Work arrangement
No

Get JobBeeper Mobile App

Never miss a job opening! Get instant job alerts on your phone.

Subscribers see fresh openings within minutes. Download the JobBeeper App on Google Play to get real-time push notifications and apply before anyone else.

⚡ Instant Push Alerts 🎯 Tailored Filters 🚀 Direct Employer Links
GET IT ON Google Play

More openings worth a look

Recently tracked roles with full details and direct application links.

6 roles
Good roles move before most people even see them. Tell JobBeeper what you want and get fresh matches delivered in minutes.
Start your free trial →
⚡ Get fresh job alerts 📱 Get App