Live opening · Posted 8 hours ago

Billing Engineer – Data Center Construction | Noida

Job24by7 · Tamil Nadu, India (On-site)
Linkedin No
You are 8 hours behind. JobBeeper subscribers saw this role while it was still new.

At a glance

The key details from the original listing.

Posted 8 hours ago
CompanyJob24by7
LocationTamil Nadu, India (On-site)
Work modeNo
SkillsPower BI
SourceLinkedin
Listed8 hours ago

Your early-applicant advantage

Live timing from JobBeeper.

Live data
23 min from Linkedin publishing this role to us finding it
12 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
71,140 roles found in the last 24 hours — the newest are not on this site yet
Start your free trial →

About the role

Description supplied by the original job listing.

Title: Billing Engineer – Data Center Projects
Location: Noida, Uttar Pradesh
Experience:
4-8 years of billing and quantity surveying experience.
Minimum 2 years of experience in Data Center, Industrial, Commercial, or Mission-Critical Projects.
Preferred Candidate Profile:
Candidates from Tamil Nadu will be preferred.
Must have relevant Data Center project experience.
Should be currently working in or around Noida/NCR and available for site-based project execution.
Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.
Strong experience in both Structural Steel/PEB and RCC/Concrete quality control is mandatory.
Position Overview:
The Billing Engineer is responsible for preparing, verifying, and managing client and subcontractor billing activities for Data Center construction projects. The role includes quantity measurement, preparation of Running Account (RA) bills, cost monitoring, variation management, and ensuring timely certification and payment in compliance with contractual requirements.
Key Responsibilities:
Client Billing:
Prepare and submit RA Bills as per contract requirements.
Prepare and finalize project closing and final bills.
Measure executed quantities from approved drawings and site records.
Coordinate with Client and PMC teams for bill verification and certification.
Ensure timely submission of invoices and supporting documentation.
Monitor certification and payment status.
Quantity Surveying & Measurement:
Measure Civil, Structural, Architectural, and MEP work quantities.
Verify executed quantities against approved BOQs and drawings.
Prepare quantity reconciliation and tracking statements.
Maintain measurement records and supporting documents.
Subcontractor Billing:
Verify subcontractor RA bills and supporting measurements.
Review quantities, rates, and work completion status.
Process payment recommendations for subcontractors.
Maintain subcontractor billing records and payment tracking.
Variation & Change Management:
Identify and quantify variation works.
Prepare Extra Item (EI) claims and variation statements.
Maintain records of change orders and client instructions.
Coordinate approvals with commercial and project teams.
Cost Control & Commercial Support:
Monitor project costs against budgeted quantities.
Track material consumption and wastage.
Prepare cost comparison and reconciliation reports.
Support project budgeting, forecasting, and cost analysis activities.
Documentation & Compliance:
Maintain billing registers, Measurement Books (MB), and quantity records.
Manage approved drawings, BOQs, contracts, work orders, and billing documents.
Ensure compliance with contractual and audit requirements.
Coordination:
Coordinate with Site Engineers, Planning Engineers, QA/QC, Procurement, Accounts, Clients, PMCs, and Subcontractors.
Participate in commercial and project review meetings.
Required Qualifications:
Bachelor’s Degree or Diploma in Civil Engineering, Mechanical Engineering, or Quantity Surveying.
Quantity Surveying Certification preferred.
Experience:
4-8 years of billing and quantity surveying experience.
Minimum 2 years of experience in Data Center, Industrial, Commercial, or Mission-Critical Projects.
Experience handling projects above INR 100 Crores preferred.
Technical Skills:
Primavera P6, MS Project, Advanced Excel, Power BI (preferred), AutoCAD, ERP Systems (SAP/Oracle).

Work arrangement
No

Get JobBeeper Mobile App

Never miss a job opening! Get instant job alerts on your phone.

Subscribers see fresh openings within minutes. Download the JobBeeper App on Google Play to get real-time push notifications and apply before anyone else.

⚡ Instant Push Alerts 🎯 Tailored Filters 🚀 Direct Employer Links
GET IT ON Google Play

More openings worth a look

Recently tracked roles with full details and direct application links.

6 roles
Good roles move before most people even see them. Tell JobBeeper what you want and get fresh matches delivered in minutes.
Start your free trial →
⚡ Get fresh job alerts 📱 Get App