Live opening · Posted 7 hours ago

Data Center - Project Manager

Astreya China · Altoona, IA
Workday
JobBeeper subscribers received an alert for this role.

At a glance

The key details from the original listing.

Posted 7 hours ago
CompanyAstreya China
LocationAltoona, IA
SourceWorkday
ListedPosted 7 hours ago

Your early-applicant advantage

Live timing from JobBeeper.

Live data
14 min from Workday publishing this role to us finding it
4 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
61,111 roles found in the last 24 hours — the newest are not on this site yet
Start your free trial →

About the role

Description supplied by the original job listing.

Rack Integration Project & Program Manager JD
Project & Program Management — Ongoing Rack Integration Operations
Position Summary
The Site Project & Program Manager owns end-to-end program delivery for an operational pre-integrated rack production and deployment site. This role is the single program point of accountability on site: it owns rack production scheduling and arrival, materials coordination, warehouse balance, BOM accuracy, QA/QC and RMA processes, and the working interface with the integration partner and cross-functional teams. The role translates rack demand and need-by dates into an executable production and materials plan, maintains clear ownership boundaries between internal teams and the integration partner, and gives leadership a clear, numbers-based view of throughput, backlog, material readiness, and risk. The role is expected to preserve production continuity while strengthening the operating model, including trackers, forecasts, escalation paths, documented ownership, and automation of manual workflows.
Key Responsibilities
Operational Leadership & Operating Model
Assume ownership of the rack integration program with minimal disruption; maintain clear scope, ownership, cadence, meeting structure, reporting, and escalation paths.
Review, clarify, and maintain the internal-team vs. integration-partner responsibility matrix — including PO creation, material transfer, material delivery, rack build, on-site variations, QA/QC, and RMA — and keep written agreement current as scope evolves.
Identify and close ownership gaps where a responsibility is claimed on paper but not actually being executed on site.
Strengthen existing workflows using proven operating models from comparable sites, and feed improvements back to the broader program.
Rack Production Planning & Scheduling
Convert rack demand, need-by dates, and site requirements into a production schedule and rack arrival plan; sequence builds against material availability and warehouse capacity.
Own rack scheduling and arrival, in-rack cabling, network, and optics coordination with the site build teams.
Provide accurate BOMs and rack demand to the materials function; partner with product quality engineering on BOM development and build-BOM ownership.
Align production schedule with the integration partner's actual throughput capability, and escalate when the two diverge.
Re-plan quickly when program decommits, forecast changes, or scope pivots change need-by dates — and quantify the downstream impact each time rather than absorbing churn silently.
Materials, Inventory & Warehouse Process Integration
Maintain strong awareness of and integrate with process for incoming and outgoing material coordination, including truck coordination and daily inbound volume.
Align operational workflows with guidelines to support warehouse balance — neither overstocked nor understocked — and ensure safety hazards from pallets staged in aisles or between rows are prevented.
Feed rolling two-week demand forecasts and lock them for the integration partner's production planning.
Coordinate move orders, BOM-to-material matching, and mismatch resolutions through integrated materials systems.
Serve as the day-to-day liaison to the integration partner's materials team, aligning daily material signals with workflows.
Monitor and support resolution of aged, excess, or stranded inventory resulting from design or implementation changes.
Collaborate across on-site programs to align shared warehouse space and protect committed turnaround times.
Quality, RMA & On-Site Variations
Own QA/QC failure triage and the RMA process end to end, including clearing and preventing RMA backlogs.
Manage on-site variations to rack design and deployment methodology, with documented decisions and traceability.
Ensure rack deployment methodology is followed consistently and captured in site documentation.
Forecasting, Data & Performance Management
Build and maintain the site's production forecast, capacity model, capacity planning, master tracker, dashboards, and operational reporting.
Report on backlog, inventory, demand, material readiness, throughput, and schedule attainment; surface trends and future constraints early.
Reconcile data across demand, materials, and production systems to find discrepancies and improve data integrity.
Define KPIs for site health — schedule attainment, material readiness, RMA cycle time, warehouse utilization — and report against them in numbers, not adjectives.
Develop and maintain short-and long-range capacity-versus-demand models to evaluate deployment feasibility, identify constraints, support site intake decisions, and prevent commitments that exceed operational capacity.
Cross-Functional Leadership & Stakeholder Management
Act as the site coordination point across internal engineering and operations teams, the integration partner, product quality engineering, capacity planning, demand planning, logistics, and site build teams.
Lead production and materials reviews, capacity discussions, and issue resolution forums.
Communicate status, risk, capacity constraints, and decisions to leadership, including executive-level readouts on production plans and revised dates.
Broker alignment between teams with competing priorities and overlapping ownership claims, and resolve boundary disputes rather than escalating them repeatedly.
Coach and support on-site materials and coordination staff; distribute workload deliberately to prevent single-point dependency and burnout.
Risk, Issue & Change Management
Proactively identify material constraints, throughput bottlenecks, warehouse capacity limits, resource gaps, and system gaps.
Develop mitigation, recovery, and contingency plans that protect deployment commitments.
Assess and document downstream impact of demand decommits, forecast changes, design changes, and schedule shifts.
Drive escalations to closure with clear ownership, decisions, and impact recorded.
Plan for resource continuity — contract end dates, site ramp-down, and transition of scope to follow-on sites.
Automation, AI & Continuous Improvement
Replace manual spreadsheet-driven planning with integrated, automated tooling; manual recalculation of demand and materials is a known failure mode at existing sites and reducing it is an explicit expectati

Get JobBeeper Mobile App

Never miss a job opening! Get instant job alerts on your phone.

Subscribers see fresh openings within minutes. Download the JobBeeper App on Google Play to get real-time push notifications and apply before anyone else.

⚡ Instant Push Alerts 🎯 Tailored Filters 🚀 Direct Employer Links
GET IT ON Google Play

More openings worth a look

Recently tracked roles with full details and direct application links.

6 roles
Good roles move before most people even see them. Tell JobBeeper what you want and get fresh matches delivered in minutes.
Start your free trial →
⚡ Get fresh job alerts 📱 Get App