Live opening · Posted 8 hours ago

Consultant on GAD Planning and Budgeting on Women, Peace, and Security

Relief International · Makati City, Legaspi Village
Bamboohr No Consultant
JobBeeper subscribers received an alert for this role.

At a glance

The key details from the original listing.

Posted 8 hours ago
CompanyRelief International
LocationMakati City, Legaspi Village
Job typeConsultant
Work modeNo
SourceBamboohr
ListedPosted 8 hours ago

Your early-applicant advantage

Live timing from JobBeeper.

Live data
2 min from Bamboohr publishing this role to us finding it
72 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
65,011 roles found in the last 24 hours — the newest are not on this site yet
Start your free trial →

About the role

Description supplied by the original job listing.

Location: Bacolod City, Naga City, and Davao City, Philippines, with preparatory work conducted remotely
Reports to: Project Manager, Tanggol Kababaihan
Engagement period: 1 month (November 3, 2026 - December 2, 2026)
Note on Logistics: Relief International will cover or directly reimburse all field travel expenses (flights, hotels, and local transportation expenses for the Bacolod, Naga, and Davao trips) separately from the professional fees.
Background
Tanggol Kababaihan: Operationalising the Philippine National Action Plan on Women, Peace and Security (NAPWPS) is a three-year initiative funded by the European Union, with the main aim of contributing to the operationalization of the 4th Philippine National Action Plan on Women, Peace, and Security. Together with Balay Mindanaw Foundation Inc. (BMFI) and Coalition for Bicol Development (CBD), forming the Tanggol Kababaihan Consortium, the action contributes to improved peace, stability and well-being among conflict-vulnerable communities in the Philippines through effective civil society engagement in enhancing local implementation of the NAPWPS and leading to better-informed policy processes along higher tiers of governance. The action is being implemented across 40 barangays in 12 cities and municipalities, covering 8 provinces and 5 regions in the Philippines. These provinces are: Camarines Sur, Negros Occidental, Northern Samar, Bukidnon, Misamis Oriental, Surigao del Sur, Agusan del Norte, and Agusan del Norte.
The Tanggol Kababaihan Action supports the localization and implementation of the 2023–2033 Philippine National Action Plan on Women, Peace and Security (NAPWPS) by strengthening the capacity of local governments, civil society organizations, community leaders, and other stakeholders to translate WPS commitments into concrete local policies, plans, programs, and actions.
The second round of the Tanggol Kababaihan Master Training focuses on Policy, Planning, and Budgeting for Women, Peace and Security. It builds on the WPS localization/gaps analysis, stakeholder mapping, identified local entry points, and community consultation findings generated during the first phase of the Action. The training aims to move participants from identifying and analyzing WPS concerns toward developing concrete institutional responses through local policy development and integration of WPS priorities into local planning and budgeting mechanisms.
Position Summary
The Tanggol Kababaihan Consortium seeks to engage a Consultant on GAD Planning and Budgeting for Women, Peace and Security (WPS) for a short-term consultancy running from 3 November to 2 December 2026 to provide technical expertise for the planning and budgeting component of the Tanggol Kababaihan Master Training 2.0.
The Consultant will design and facilitate a one-day practical session on GAD Planning and Budgeting for WPS for each of the three Master Training batches. The session will strengthen the capacity of Tanggol Kababaihan Master Trainers, representatives of Local Government Units (LGUs), Civil Society Organizations (CSOs), and other stakeholders to translate identified WPS priorities into concrete Programs, Activities, and Projects (PAPs) that can be integrated into local GAD Plans and Budgets.
The session will build on the WPS issues and priorities identified through the Tanggol Kababaihan WPS localization/gaps analysis, community consultations, and the Day 1 assessment and prioritization process, as well as the policy responses discussed during Day 2. The principal workshop output will be participant-developed draft WPS-responsive GAD Plans and Budgets containing appropriate PAPs, targets, indicators, responsible offices, and indicative budgets for their respective project areas/LGUs.
Scope of Work
1. Preparatory Review and Development of the GAD Planning and Budgeting Session
The Consultant shall:
Review the Tanggol Kababaihan Master Training 2.0 Activity Design and relevant project materials provided by RI;
Review the priority WPS issues, gaps, and recommendations generated through the WPS localization/gaps analysis and community consultations;
Review relevant national policies, guidelines, and frameworks governing GAD planning and budgeting for Philippine LGUs;
Coordinate with the RI Gender, Peace, and Governance Specialist to ensure alignment of the session with the overall objectives, methodology, and expected outputs of the Master Training;
Develop a detailed one-day session design that balances technical discussion with practical workshop application;
Develop or adapt a practical GAD Planning and Budgeting template that participants can use to translate identified WPS priorities into appropriate PAPs, targets, indicators, responsible offices, and indicative budgets; and
Prepare the presentation materials, workshop instructions, templates, and other technical learning materials required for the session.
2. Facilitation of Day 3 – Planning and Budgeting for WPS
The Consultant shall serve as the lead technical resource person and facilitator for the GAD Planning and Budgeting component of all three Master Training batches.
The Consultant shall facilitate a one-day session covering, at minimum:
Understanding GAD Planning and Budgeting: Key concepts, requirements, processes, and responsibilities relevant to local GAD planning and budgeting;
Connecting WPS and GAD: Understanding how WPS priorities can be addressed through existing GAD planning and budgeting mechanisms;
From WPS Issues to GAD PAPs: Translating priority WPS issues and identified gender gaps into appropriate Programs, Activities, and Projects;
Developing Results and Indicators: Formulating clear objectives, targets, indicators, and expected results for WPS-responsive PAPs;
Assigning Institutional Responsibilities: Identifying appropriate responsible offices and opportunities for inter-office and multi-stakeholder coordination;
Budgeting for WPS: Developing realistic and indicative budgets for proposed WPS-responsive PAPs; and
GAD Planning and Budgeting Workshop: Applying the planning and budgeting process to develop participant-level draft WPS-responsive GAD Plans and Budgets.
The Consultant shall use participatory and adult-learning methodologies and provide sufficient time for practical application and hands-on coaching.
3. Facilitation of the WPS-Responsive GAD Planning and Budgeting Workshop
The Consultant shall guide participants through a practical workshop that applies the learning from the technical sessions to the WPS priorities identified through the Tanggol Kababaihan process.
During the workshop, the Consultant shall:
Guide participants in reviewing and prioritizing the WPS issues and gender gaps relevant to their respective project areas and LGUs;
Support participants in translating these priority issues into appropriate and feasible WPS-responsive PAPs;
Guide participants in developing clear objectives, activities, expected results, targets, indicators, responsible offices, and indicative budgets;
Assist participants in ensuring logical alignment between the identified WPS issue or gender gap and the proposed intervention;
Guide participants in identifying appropriate institutional responsibilities and opportunities for coordination among relevant LGU offices, CSOs, women's organizations, and other stakeholders;
Ensure that proposed PAPs are gender-responsive, inclusive, conflict-sensitive, and responsive to the evidence and priorities generated through the project;
Provide hands-on technical coaching and feedback to participant groups as they develop their draft GAD Plans and Budgets;
Facilitate the presentation and initial review of group outputs; and
Guide participants in identifying the next steps required to further validate, refine, and integrate the proposed PAPs into their respective local GAD planning and budgeting processes.
The workshop shall result in draft WPS-responsive GAD Plans and Budgets developed by the participants, containing priority PAPs with corresponding targets, indicators, responsible offices, and indicative budgets.
The drafts will serve as working documents that participants can bring back to their respective LGUs for further validation, refinement, integration, and consideration through the appropriate GAD planning and budgeting processes.
Key Deliverables
1. Preparatory Review and Development of Training Package
Review of relevant Tanggol

Employment type
Consultant

Work arrangement
No

Get JobBeeper Mobile App

Never miss a job opening! Get instant job alerts on your phone.

Subscribers see fresh openings within minutes. Download the JobBeeper App on Google Play to get real-time push notifications and apply before anyone else.

⚡ Instant Push Alerts 🎯 Tailored Filters 🚀 Direct Employer Links
GET IT ON Google Play

More openings worth a look

Recently tracked roles with full details and direct application links.

6 roles
Good roles move before most people even see them. Tell JobBeeper what you want and get fresh matches delivered in minutes.
Start your free trial →
⚡ Get fresh job alerts 📱 Get App