Live opening · Posted 1 day ago
At a glance
The key details from the original listing.
About the role
Description supplied by the original job listing.
CMR will do DMDR for each milestone and record his observation, ASR will compile the list, where repair rules are not respected, categorise priority as K1, K2, K3 & present the summary
To verify the reparability as per the BMIR during the digital phase and negotiate for deviations and get the changes implemented All TGA to be 100% verified OK for Reparability rules in After Sales. Achieve 0 K1,K2,K3 in DMDR reviews and ensure 100% TGA parts are meeting aftersales requirements in Reparability, Spare parts and Labor time services. Ensure to share data and get engineering technical documents, 3D CAD, POS at ABPT1 to prepare RM-LT and validation of Repair methods from respective development pilot.
Work arrangement
No
Your early-applicant advantage
Live timing from JobBeeper.
More openings worth a look
Recently tracked roles with full details and direct application links.