Public listing
Associate-Damage Excess
- Experience3 - 4 Years
- Work modeNo
- EmploymentPermanent
- ListedPosted 1 day ago
- SourceDarwinbox
Role overview
About the role
Description supplied by the original job listing.
ParameterDetails
DEPS EscalationsRoot cause analysis on every DEPS case. TAT - 48hrs.
Identification of DEPSI responsible Employee/BP/Vendor with supporting evidences.
CCTV FootagesReview and sharing of CCTV footage & Key highlights with the DEPS HO team shall be completed within the defined TAT of 24 hours.
ShortagesMaterial Tracing procedure to be followed and resolve shortages with-in TAT of 48hrs.
A) Conduct an initial floor check to verify the material's physical location.
B) Collaborate with branches to pinpoint the material's whereabouts within the cluster.
C) Coordinate with other clusters to trace the material's movement within the distribution pipeline.
D) Analyze the single scan report to facilitate the material's tracing process.
E) Scrutinize CCTV footage to identify any potential misrouting scenarios.
DamageDamage Ticket Closure Requirements with the TAT of 2hrs :
A) All damage tickets within clusters will be closed in accordance with the provided guidelines.
B) Each ticket must include clearly visible images.
C) All tickets will be closed following the established guidelines.
D) Material invoices, along with loss details, must be updated within the damage ticket.
E) The remarks column should contain remarks adhering to the provided guidelines.
Interchange & Wrong deliveryResolution with-in TAT : 7Days
A) Identify the cross connection of boxes with the help of interchange HO desk.
B) Initiate the retrieval of misdirected boxes from consignees and ensure their proper redirection to the correct addresses.
C) RCA on Wrong connections.
Disciplinary actionsActions: to be taken on at least 10 negligiance towards SOP per month.
A) Identify the individual responsible for the DEPS issue with supporting evidence and 1 statment of that indiviuals
B) Provide training after taking first statement, with the owner's manager informed, for the first instance of negligence towards the SOP.
C) Issue Second Statement for checking repeatation, show-cause letter to the owner.
D) Implement a Performance Improvement Plan along with the issuance of a third and final warning letter to the owner for the third instance of negligence, involving their respective HR and manager.
E) Termination the owner from their current role upon the fourth instance of negligence.
UCG1) Identify the orphan consigment.
2) Performing the RCA with reason.
3) Nos of Consigment recover.
4) Need to maitain the Data of UCG.
Experience
3 - 4 Years
Employment type
Permanent
Work arrangement
No
Your early-applicant advantage
How quickly JobBeeper finds and shares openings.
Job alerts
Get notified about new openings
Save your preferences, then add a paid plan for matching job alerts.