Live opening · Posted 3 days ago

Onsite Safety Professional - Data Center Construction (East Region)

TurnerTownsend · Manassas, Virginia, United States
Smartrecruiters No Full-time
You are 3 days behind. JobBeeper subscribers saw this role while it was still new.

At a glance

The key details from the original listing.

Posted 3 days ago
CompanyTurnerTownsend
LocationManassas, Virginia, United States
Job typeFull-time
Work modeNo
SourceSmartrecruiters
Listed3 days ago

Your early-applicant advantage

Live timing from JobBeeper.

Live data
4 min from Smartrecruiters publishing this role to us finding it
7 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
73,772 roles found in the last 24 hours — the newest are not on this site yet
Start your free trial →

About the role

Description supplied by the original job listing.

About the Role:
As an Onsite Safety Professional, you serve as the primary safety authority for major campus developments in the East Region. This dynamic, project-based position involves deploying to various client sites for 3- to 5-year engagements to ensure rigorous safety compliance and risk mitigation in high-stakes, critical environments.
You will operate directly from onsite construction trailers, spending 70% of your time in the field providing oversight and 30% on critical documentation. Because construction timelines fluctuate, you must be available on-site five days a week. Your schedule will vary based on project demands, ranging from standard shifts (7:00 a.m. to 4:00 p.m.) to extended hours required to resolve safety incidents.
We are actively staffing assignments in Manassas, VA, and Summerville, SC. Relocation consideration will be available for qualified applicants.
What You’ll Do:
* Field Oversight & Compliance: Conduct daily site walks to identify hazards, enforce safety protocols, and monitor the General Contractor’s (GC) adherence to EHS practices, regulatory requirements, and owner-specific deliverables.
* Documentation & Reporting: Manage comprehensive safety records, including leading and lagging indicators, and ensure all EHS data submitted by the GC is accurate, timely, and complete. Issue weekly EHS summaries and conduct monthly GC EHS evaluations.
* Strategic Advisory: Serve as an expert coach and advisor to the site safety committee. Support the construction management team by delivering current data on EHS performance, metrics, and incident management to facilitate informed, timely decision-making.
* Risk Management: Assist in the conduct of risk/hazard assessments and participate in significant incident investigations. Promptly escalate non-compliance issues to both the GC and owner’s management.
* Communication & Collaboration: Lead safety meetings and ensure relevant EHS information is disseminated across the site. Facilitate daily and weekly safety tours with GC and owner’s representatives.
* Project Lifecycle Support: Assist in design reviews across the project lifecycle, including planning, permitting, construction, commissioning, and handover. Contribute to the development of the Data Center Construction EHS Plan (DCCEHSP).
* Operational Execution: Oversee the "Boots on the Ground" program and participate in progress/schedule meetings where EHS is impacted.
What You’ll Need
Education & Experience: Bachelor’s degree in Safety Management, Architecture, Engineering, Construction Management, or a related field. Minimum of 5 years of construction safety experience in critical environments (Data Centers, Healthcare, Nuclear, or similar).
Technical Proficiency: Proven experience in general construction safety and electrical construction, with specific expertise in medium voltage systems. Ability to read/understand architectural drawings and knowledge of construction best practices, building codes, and systems.
Software Skills: Intermediate proficiency in Microsoft Office Suite and Google Suite. Familiarity with MS Project and contract/lease administration.
Certifications:
Adaptability: Proven ability to thrive in a traveling, project-based environment.
Work Authorization: Applicants must be currently authorized to work in the United States without the need for visa sponsorship.

Employment type
Full-time

Work arrangement
No

Get JobBeeper Mobile App

Never miss a job opening! Get instant job alerts on your phone.

Subscribers see fresh openings within minutes. Download the JobBeeper App on Google Play to get real-time push notifications and apply before anyone else.

⚡ Instant Push Alerts 🎯 Tailored Filters 🚀 Direct Employer Links
GET IT ON Google Play

More openings worth a look

Recently tracked roles with full details and direct application links.

6 roles
Good roles move before most people even see them. Tell JobBeeper what you want and get fresh matches delivered in minutes.
Start your free trial →
⚡ Get fresh job alerts 📱 Get App