Public listing

Future Opportunities — Electricians & Electrical Laborers – Datacenter Construction, Industrial Construction, Civil Construction

Green Tanner Industrial Austin, Texas, United States
  • Work modeYes
  • EmploymentFull-Time
  • ListedPosted 1 day ago
  • SourceBamboohr

Role overview

About the role

Description supplied by the original job listing.

GTI is expanding into Texas. We are building a pipeline of qualified candidates for future project opportunities across electrical, civil, field leadership, project management, and support roles. This evergreen posting allows us to connect with talented people before specific openings are available so we can move quickly when projects begin. We are looking to start the projects around December and will be in contact with candidates around October and November of this year.
About Green Tanner Industrial
Green Tanner Industrial Construction is preparing to expand into the Texas market and is seeking qualified electrical field talent for future industrial, commercial, mission-critical, and infrastructure-related projects. We perform complex work where safety, craftsmanship, productivity, and teamwork are essential.
This posting is intended to build a pipeline of electricians, electrical apprentices, helpers, and laborers who may be interested in future opportunities with GTI in Texas.
Possible Future Roles May Include
Electrical Laborer
Journeyman-Level Electrician
Cable Puller
Terminator
Equipment Grounding/Bonding Support
Electrical Service or Maintenance Technician
Typical Work May Include
Depending on the project and role, future work may involve:
Assisting with installation of electrical systems on industrial, commercial, data center, utility, or infrastructure projects
Installing conduit, cable tray, supports, raceways, boxes, panels, gear, and electrical equipment
Pulling, routing, labeling, landing, and terminating wire or cable
Supporting medium-voltage and low-voltage installations
Assisting with grounding, bonding, testing, inspections, and documentation
Reading basic drawings, one-lines, layout drawings, and work instructions
Supporting layout, material handling, housekeeping, and workface planning
Following lockout/tagout, energized work, PPE, and site safety requirements
Working safely around heavy equipment, lifts, trenches, excavations, and active construction areas
Skills & Experience We Look For
Strong candidates may have experience with:
Conduit bending and installation
Cable pulling and terminations
Electrical hand tools and power tools
Cable tray, supports, hangers, and raceway systems
Grounding and bonding
Panelboards, switchgear, transformers, disconnects, and electrical equipment
Low-voltage, medium-voltage, industrial, commercial, or data center electrical work
Reading electrical drawings, plans, or one-line diagrams
OSHA, NFPA 70E, lockout/tagout, and basic construction safety practices
Working in a crew environment with foremen, leads, and project supervision
General Requirements
Previous electrical or construction experience preferred; entry-level candidates may be considered for laborer/helper roles
Ability to work safely and follow instructions
Ability to lift, carry, climb, bend, kneel, and work in outdoor or active construction environments
Reliable transportation to assigned project locations
Willingness to work overtime, weekends, or adjusted schedules when project needs require
Ability to pass required pre-employment and site-specific requirements
Valid driver’s license required for some roles
OSHA10 minimum required for all on-site roles; OSHA30 required for field leadership roles
NFPA 70E, CPR/First Aid, lift certifications, or electrical apprenticeship experience are a plus
Why Join GTI
GTI is looking for people who take pride in doing the job right. We value safe work, strong crews, clear communication, and people who want to keep learning. As we grow into Texas, we are looking for electrical professionals who want to be part of a team that values skill, reliability, and career growth.
Additional Information
This is an evergreen posting for future opportunities. Submitting an application does not guarantee an immediate opening, but it allows GTI to contact qualified candidates as roles become available.
Green Tanner Industrial Construction is an Equal Opportunity Employer. We consider applicants based on qualifications, experience, and business needs, and we do not discriminate based on protected characteristics under applicable federal, state, or local law. The EEOC identifies protected categories in hiring to include race, color, religion, sex, national origin, age 40 or older, disability, and genetic information, among others.

Skills
Project Management, Documentation

Employment type
Full-Time

Work arrangement
Yes

Skills from the listing

  • Project Management
  • Documentation

Your early-applicant advantage

How quickly JobBeeper finds and shares openings.

228 min from Bamboohr publishing this role to us finding it
3 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
43,655 roles found in the last 24 hours
See available plans →

Job alerts

Get notified about new openings

Save your preferences, then add a paid plan for matching job alerts.

Create free account
Log in to apply