Public listing

Future Opportunities — Civil Roles & Equipment Operators – Datacenter Construction, Industrial Construction, Civil Construction

Green Tanner Industrial Austin, Texas, United States
  • Work modeYes
  • EmploymentFull-Time
  • ListedPosted 1 day ago
  • SourceBamboohr

Role overview

About the role

Description supplied by the original job listing.

GTI is expanding into Texas. We are building a pipeline of qualified candidates for future project opportunities across electrical, civil, field leadership, project management, and support roles. This evergreen posting allows us to connect with talented people before specific openings are available so we can move quickly when projects begin. We are looking to start the projects around December and will be in contact with candidates around October and November of this year.
About Green Tanner Industrial
Green Tanner Industrial Construction is preparing to expand into the Texas market and is building a pipeline of qualified civil construction professionals and equipment operators for future project opportunities.
This posting is intended for candidates with experience in civil construction, underground utilities, grading, excavation, site work, concrete support, trenching, backfill, and equipment operation.
Possible Future Roles May Include
Civil Laborer
Skilled Laborer
Pipe/Utility Laborer
Grade Checker
Spotter
Excavation Crew Member
Equipment Operator
Skid Steer Operator
Excavator Operator
Wheel Loader Operator
Dozer Operator
Backhoe Operator
Water Truck Driver
Articulated Haul Truck Operator
I know we don't use all of these as official job titles internally, but I wanted to include them here so people have an idea of the types of work we'll be looking for people to perform.
I know we don't use all of these as official job titles internally, but I wanted to include them here so people have an idea of the types of work we'll be looking for people to perform.
I know we don't use all of these as official job titles internally, but I wanted to include them here so people have an idea of the types of work we'll be looking for people to perform.
I know we don't use all of these as official job titles internally, but I wanted to include them here so people have an idea of the types of work we'll be looking for people to perform.
Typical Work May Include
Depending on the project and role, future work may involve:
Supporting civil, underground, dry utility, electrical infrastructure, and site development scopes
Excavation, trenching, grading, backfill, compaction, and site preparation
Assisting with duct banks, utility corridors, concrete encasement, grounding, and underground electrical support
Operating heavy equipment safely and productively
Performing daily equipment inspections and basic maintenance checks
Supporting layout, grade control, spotting, rigging, material movement, and housekeeping
Working around trenches, excavations, heavy equipment, lifts, and active electrical construction areas
Following safety procedures for excavation, confined spaces, traffic control, utility awareness, and equipment operation
Coordinating closely with foremen, operators, electricians, survey/layout teams, and project supervision
Skills & Experience We Look For
Strong candidates may have experience with:
Excavation, trenching, grading, backfill, and compaction
Underground utilities or dry utility installation
Civil work supporting electrical or data center construction
Equipment operation in active construction environments
Reading grade stakes, drawings, utility plans, or basic civil layouts
Working safely around underground utilities and energized work areas
Spotting equipment and maintaining safe work zones
Trench safety, excavation awareness, traffic control, and site housekeeping
OSHA, competent person awareness, or equipment-specific training
General Requirements
OSHA10 minimum required for all on-site roles; OSHA30 required for field leadership roles
Previous civil construction, utility, equipment operation, or general construction experience preferred
Ability to work safely in outdoor and physically demanding environments
Ability to lift, carry, climb, bend, kneel, shovel, rake, and perform manual labor as needed
Reliable transportation to assigned project locations
Willingness to work overtime, weekends, or adjusted schedules when project needs require
Ability to pass required pre-employment and site-specific requirements
Valid driver’s license preferred; CDL may be required or preferred for some roles
Equipment certifications, trench safety, rigging, signal person, or first aid/CPR certifications are a plus
Why Join GTI
GTI values people who work hard, work safely, and support the crew. We are looking for civil and equipment professionals who understand that good field execution depends on communication, planning, and taking pride in the details. As GTI expands into Texas, we want to connect with people who can help us build strong, safe, productive projects.
Additional Information
This is an evergreen posting for future opportunities. Submitting an application does not guarantee an immediate opening, but it allows GTI to contact qualified candidates as roles become available.
Green Tanner Industrial Construction is an Equal Opportunity Employer. We consider applicants based on qualifications, experience, and business needs, and we do not discriminate based on protected characteristics under applicable federal, state, or local law. The EEOC identifies protected categories in hiring to include race, color, religion, sex, national origin, age 40 or older, disability, and genetic information, among others.
I know we don't use all of these as official job titles internally, but I wanted to include them here so people have an idea of the types of work we'll be looking for people to perform.

Skills
Project Management

Employment type
Full-Time

Work arrangement
Yes

Skills from the listing

  • Project Management

Your early-applicant advantage

How quickly JobBeeper finds and shares openings.

228 min from Bamboohr publishing this role to us finding it
5 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
51,724 roles found in the last 24 hours
See available plans →

Job alerts

Get notified about new openings

Save your preferences, then add a paid plan for matching job alerts.

Create free account
Log in to apply