Live opening · Posted 21 hours ago

SH Piece Dyeing

Aditya Birla Group · Maharashtra, India (On-site)
Linkedin No
You are 21 hours behind. JobBeeper subscribers saw this role while it was still new.

At a glance

The key details from the original listing.

Posted 21 hours ago
CompanyAditya Birla Group
LocationMaharashtra, India (On-site)
Work modeNo
SourceLinkedin
Listed21 hours ago

Your early-applicant advantage

Live timing from JobBeeper.

Live data
9 min from Linkedin publishing this role to us finding it
5 min median time from a role going live to a subscriber being told
6 hours subscribers had this role before this page existed
73,006 roles found in the last 24 hours — the newest are not on this site yet
Start your free trial →

About the role

Description supplied by the original job listing.

This is textile Industry and the position is based on Kolhapur location & there is no accommodation basis.Job Purpose
To coordinate in ensuring least fabric rejection due to processing reasons by checking for adherence to SOPs while operating machines. To coordinate in deciding for actions to troubleshoot any fabric or machine defects. To coordinate with other concerned departments for efficient production planning and defect corrections. To coordinate in maintaining smooth worker handling while training workers for multi-skill development. To monitor stocks, prepare ISO documents and coordinate in developing SOPs for new product development.
Job Context & Major Challenges
Job Context
The processing department in GPFPL has 21 machines with the maximum processing capacity of 100 lacs meters per annum. Around 73.5 lac meters of fabric is processed annually. Thus, there is under-utilization of the machines because of which the processing shop floor is operational only for 4 days in a week. Each of the machines in the processing department have a capacity of around 50,000 meters which can be fed by around 100 looms, if operated continuously. Over the time, the focus of the department has shifted from adherence of standard procedures to cost optimization.
Key Result Areas
KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)
KRA1 Piece dyeing planning, monitoring activity. Piece dyeing LAB activity. Productivity and waste control. Dyes and chemical consumption monitoring New product Development- Piece dyeing Daily piece dyeing production planning, monitoring and
control in cordination of PPC and Production chief.
Handling and Lab and Lab to Bulk control of Piece
dyeing activity . To assure the achievement of quality ,
RFT and waste control as per STD . Maintaining daily
Dyes & chemical consumption record New product development for piece dyeing in coordination with NPD team

Work arrangement
No

Get JobBeeper Mobile App

Never miss a job opening! Get instant job alerts on your phone.

Subscribers see fresh openings within minutes. Download the JobBeeper App on Google Play to get real-time push notifications and apply before anyone else.

⚡ Instant Push Alerts 🎯 Tailored Filters 🚀 Direct Employer Links
GET IT ON Google Play

More openings worth a look

Recently tracked roles with full details and direct application links.

6 roles
Good roles move before most people even see them. Tell JobBeeper what you want and get fresh matches delivered in minutes.
Start your free trial →
⚡ Get fresh job alerts 📱 Get App